Sanima Mai Hydropower Ltd.(SHPC)

Naksal, Ktm, Nepal; Ph: 01-4415314

RTS: Sanima Capital Ltd.
As on

Rs.
,
Tran.
Volume
Amount
  Buy  Sell  Hold

Financial Highlights (3rd quarter, 2074/075)

Earning Per Share
23.3
Net Asset Per Share
0
Net Worth Per Share
126.2
Paid up Capital(Rs in '000')
2110000
Reserve and Surplus(Rs in '000')
61137
Operating Profit(Rs in '000')
202005
Net Profit(Rs in '000')
491946
Price Earning Ratio
Liquidity Ratio
Fiscal YearBonus ShareCash Dividend
Sector
Hydro Power
Operation Date
NA
Listed Status
Yes
Face Value
100
Listed Share
10550000
Market Capitalization

The feasibility study of Mai Hydropower Project (MHP) was undertaken by Sanima Hydropower Ltd. Initially, in June 2006, MHP was proposed as a daily peaking run of river project with installed capacity of 22MW. After discussion with Nepal Electricity Authority(NEA), the daily peaking option was abandoned (as recommended by NEA, the government’s power utility to purchase power from the Project) and an optimum simple run-of river scheme with installed capacity of 14.5MW was technically concluded with NEA in year 2007 with the energy price open for negotiation. With the amendment in the Power Purchase Agreement between Nepal Electricity Authority and Sanima Mai Hydropower Limited the capacity has been increased to 22MW from 15.6MW. Thus the total capacity of Sanima Mai Hydropower Limited is now 22MW. In Year 2008, Sanima (P) Limited (SMPL) established a special purpose vehicle company ""Sanima Mai Hydropower Limited"" for the implementation of Mai Hydropower Project (22MW) and Mai Cascade Hydropower Project (7MW). The PPA of Mai HP was signed on 8th Baisakh 2069 and MCHP on 12th Magh 2069. The construction of Mai HP started on Magh 2067 and that of MCHP started on Shrawan 2070.

Contact Information
Address
Naksal, Ktm, Nepal
Phone
01-4415314
E-Mail
sanimamai@sanimahydro.com
DateFiscal YearDurationTitle
DateQuantityRateAmount
DateCloseVolumeAmount
SNTraded DateLast PriceMkt Cap (Mil)
1Dec 12, 20181841,960.37
2Dec 12, 20181952,925.00